Danny 647-821-4635
Waterloo Kitchener Chinese Handyman
Over 10 years construction and renovation experience
Home renovation and repair
4-day bathroom remodel (CAD3,000 with fiber glass shower base)
5-day bathroom remodel (CAD3,800 with tiled shower base)
Kitchen demolition & tiling/flooring for cabinets installation
preparation
Pre-sale renovation
1-day rental property touch up
Painting, drain unclogging, leaks repair and general maintenance
Serving Waterloo Kitchener and surrounding areas
Mandarin, Cantonese or English
Bathroom remodel
Standard sized 3-piece bathroom
Or
2-piece powder room to 3-piece shower conversion
(3-piece = bathtub/shower, toilet and vanity)
4 days from demolition to finish
(CAD3,000 cash labor cost with fiber glass shower base)
5 days from demolition to finish
(CAD3,800 cash labor cost with tiled shower base)
(not including materials and waste management station fee, please see breakdown in picture)
(materials estimate generally around CAD2,500 before tax)
Focus on one and only one project at a time
No dragging
No hopping around
No re-negotiating
Kitchen demolition & tiling for cabinets installation preparation
Painting, leaks repair and general maintenance.
Danny 647-821-4635